Hello All,
I have a problem, however when I have tried to get to grips with the PT it seems to get very complex! I have say a single Project with hours worked on specific days for a particular trade, these hours are split between Normal, Time+Half, Double Time (in seperate columns). I was hopeful of producing a PT ultimately detailing ..by Trade, Total Normal Hours, Time+Half Hours, Double Time Hours against the Project. Is this possible and are PTs the best way of going about it or would I be better considering an Array option? Thanking you in advance. Sam [ This Message was edited by: Sam40mUK on 2002-03-19 14:32 ] [ This Message was edited by: Sam40mUK on 2002-03-19 15:56 ] |
|
|
|
|
|
#2 |
|
MrExcel MVP
Join Date: Feb 2002
Location: Millbank, London, UK
Posts: 1,790
|
Hi Sam,
not being able to see the specific data, but yeah, sounds like a job for pivot tables..... what was going wrong ? hope this reassures you a little, Chris ps...hope Wrexham don't go down |
|
|
|
![]() |
| Bookmarks |
| Thread Tools | |
| Display Modes | |
|
|