Im trying to find a formula or way to enter dimensions of trenches (rectangles) or squares that we bid to concrete saw cut.
then calculate how much linear footage there is to saw cut.

Example:
20' x 1' trench saw cut into 2' x 1' pieces. (that's cutting perimeter and making cross cuts every 1')

or

25' x 25' area cut into 2' x 1' pieces.

any help would be great!

thank you
 

Excel Facts

What is the fastest way to copy a formula?
If A2:A50000 contain data. Enter a formula in B2. Select B2. Double-click the Fill Handle and Excel will shoot the formula down to B50000.
Hi HardRockMike, are you able to post any raw data that you may already have so I can get a better understanding?
 
Upvote 0
How accurate are you trying to be? You can't cut a 25 x 25 block into 2 x 1 blocks.
 
Upvote 0
ok, im working on a bid right now, this is some of what I have.

26' x 12' area
44' x 7' area
16' x 18' area
32' x 15'

If I Work out my example from above of a 20' x 1' trench my total LF to saw is 51 LF
2) 20 cuts the length of trench
11) 1' cuts for cross cuts
=51'

or perimeter sawing is 42'
and your 9 cross cuts every 2' = 9'
total 51' of sawing
 
Upvote 0
I understand that, for those we always bump it up a cut or 'add an extra cut'
Id rather be high on my total then underbid myself on the work we actually do.

on that note,

I guess would there be an easy way to interchange the size pieces I cut them into.

some customers like 4' x 4' pieces because they can get heavy equipment in to lift them.

I say 2' x 1' just because its our 'normal' pieces if we hand remove them
 
Upvote 0
Then maybe ...

Row\Col
A​
B​
C​
D​
E​
F​
1​
Length
Width
Length
Width
2​
20​
1​
2​
1​
51​
E2: =CEILING(A2/C2, 1) * CEILING(B2/D2, 1) * (C2+D2) + A2 + B2
3​
25​
25​
2​
1​
1025​
4​
25​
25​
4​
4​
442​
 
Upvote 0
hmmm interesting. this is awesome.

how close will it work with something
like a

44' x 7' area cut into 5' x 5' pieces. I know this is an odd size for pieces on this trench but its what they want (???)

either way this is great stuff, thanks. keep them coming
 
Upvote 0
If I use that and do 100' x 10' trench into 5' x 5' pieces, that formula comes up short 100 LF
its telling me 410 and I think it should be 510

3) 100' cuts
21) 10' cuts
 
Upvote 0
If I use that and do 100' x 10' trench into 5' x 5' pieces, that formula comes up short 100 LF
its telling me 410 and I think it should be 510
Row\Col
A​
B​
C​
D​
E​
F​
1​
Length
Width
Length
Width
2​
100​
10​
5​
5​
510​
E2: =CEILING(A2/C2, 1) * CEILING(B2/D2, 1) * (C2+D2) + A2 + B2
 
Upvote 0

Forum statistics

Threads
1,213,507
Messages
6,114,029
Members
448,543
Latest member
MartinLarkin

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top