759am

  1. K

    DATE/TIME Formula

    Hello, I have a column which contains DATE/TIME (3/14/12 1:30 PM) in excel. This column is called "Arrival Time". What I am trying to do is to look at this column and determine what the "Processing Date" should be. Here is the caveat. Files arrived from 8am - 7:59am the next day are...

Some videos you may like

This Week's Hot Topics

  • Sort code advice please
    Hi, I have the code below which im trying to edit but getting a little stuck. This was the original code which worked fine,columns A-F would sort...
  • SUMPRODUCT with nested If statement
    Hi everyone, Hope you're all well. I'm hoping someone will be able to point me in the right direction with a problem I'm having with a SUMPRODUCT...
  • VBA - simple sort is killing me!
    Hello all! This should be so easy, but not for me, apparently! I have a table of data that can be of varying lengths and widths. My current macro...
  • Compare Two Lists
    I have two Lists and I need to be able to Identify differences between them. List 100 comes from a workbook - the other is downloaded form the...
  • Formula that deducts points for each code I input.
    I am trying to create a formula that will have each student in my class start at 100 points and then for each code that I enter (PP for Poor...
  • Conditional formatting formula required for day of week and a value
    Hi, I have a really simple spreadsheet where column A is the date, column B is the activity total shown as a number and column C states the day of...
Top