Hi,
I am looking for help and I think the sum(if(frequency formula can help me but I can't fully understand what is going on. I have 2 types of changeovers I need to calculate. A minor changeover is a change from SKU to SKU. A major changeover is a change from 1 size to another size. The minor changeover is only 6 hours and a major changeover is 32 hours. Based off the table below, there are 4 changeovers, 2 of which are major. I need two formulas - one to identify how many major changeovers there are and then apply the hours per changeover accordingly and one to identify how many minor changeovers there are (total - major) or vice versa (how many minor changeovers and then major changeovers (total-minor). I plan on having a dropdown for each site where production is running so the number of SKU's, the sizes and number of sizes, and the production amounts will change with each dropdown selection.
<tbody>
</tbody>
Minor Changeover: should be 2 minor changes * 6 hours = 12
Major Changeover: should be 2 major changes * 32 hours = 64
Thanks for your help. Let me know if you need more information.
I am looking for help and I think the sum(if(frequency formula can help me but I can't fully understand what is going on. I have 2 types of changeovers I need to calculate. A minor changeover is a change from SKU to SKU. A major changeover is a change from 1 size to another size. The minor changeover is only 6 hours and a major changeover is 32 hours. Based off the table below, there are 4 changeovers, 2 of which are major. I need two formulas - one to identify how many major changeovers there are and then apply the hours per changeover accordingly and one to identify how many minor changeovers there are (total - major) or vice versa (how many minor changeovers and then major changeovers (total-minor). I plan on having a dropdown for each site where production is running so the number of SKU's, the sizes and number of sizes, and the production amounts will change with each dropdown selection.
SKU | Size | Oct 14 Production |
2 | 4 | 0 |
3 | 4 | 32 |
4 | 0.5 | 0 |
5 | 1 | 0 |
6 | 2 | 10 |
7 | 4 | 30 |
8 | 2 | 15 |
<tbody>
</tbody>
Minor Changeover: should be 2 minor changes * 6 hours = 12
Major Changeover: should be 2 major changes * 32 hours = 64
Thanks for your help. Let me know if you need more information.