When creating an s-curve with a data table showing below, excel arbitrarily omits data due to high number of weeks required in table. Is there a way to control the range of the table that shows, in effect, scrolling the active portion of the table from left to right as the project progresses? Any help is welcome to work with data tables. Thanks.