I am working with the following information.
each line has an entry with a date in its own column. I want to calculate in the 3rd column 2 weeks later from the date in question. Is there a formula that can do that? (MM/DD/YYYY)
in other words is there a way to take this:
04/29/2011 + 2 weeks = 05/13/2011
and convert it into a =SUM formula?
each line has an entry with a date in its own column. I want to calculate in the 3rd column 2 weeks later from the date in question. Is there a formula that can do that? (MM/DD/YYYY)
in other words is there a way to take this:
04/29/2011 + 2 weeks = 05/13/2011
and convert it into a =SUM formula?