Hello guys,
I have searched the forum but i cannot find something similar to my actual problem.
I tried to make a classic speedometer with doughnut and pie chart and it does not work properly (ex. my value is 80 and the needle is somewhere else totally)
I use excel 2013.
The speedometer should only be between those values
I will list my values below as well my thresholds for the chart.
<tbody>
</tbody>
Can you guys please help me out? I am stressed out for the last 3 weeks. Tried everything and i cannot figure it out.
Thank you very much,
Razvan
I have searched the forum but i cannot find something similar to my actual problem.
I tried to make a classic speedometer with doughnut and pie chart and it does not work properly (ex. my value is 80 and the needle is somewhere else totally)
I use excel 2013.
The speedometer should only be between those values
I will list my values below as well my thresholds for the chart.
C/R | A | B | C | D | E | F | G | |
1 | Values | Red | Light red | Yellow | Light Yellow | Green | Light Green | |
2 |
<tbody> </tbody> | 30% | 40% | 50% | 60% | 70% | 80% | |
3 |
<tbody> </tbody> | 76% | 80% | 84% | 88% | 92% | 96% | |
4 |
<tbody> </tbody> | 50% | 40% | 30% | 20% | 15% | 10% |
<tbody>
</tbody>
Can you guys please help me out? I am stressed out for the last 3 weeks. Tried everything and i cannot figure it out.
Thank you very much,
Razvan