I am trying to figure out which graph should be used to best represent how long it takes to complete a job with a breakdown of how long each task takes by using the start times from each task to get the time intervas. This will actually be done over multiple stataions.
record task1 task2 task3 task4 task5 task6 task7
1 10:00:00 10:08:00 10:10:00 10:10:45 10:11:00 10:12:22 10:20:16
2 11:05:14 11:15:04 11:17:45 11:18:35 11:18:55 11:20:00 11:28:36
3
4
5
So I have the time it takes to complete each task by subtracting the the start time of the next task from the previous one (task2-task1 = time it takes to complete task 1; task3-task2 = time it takes to complete task2...so on), with the exception of the last task with is the total time to complete the job (task7-task1 = total time to complete job).
When it's all said and done, I will have over 100 records and want to show a breakdown of how long it takes to complete its job based on the time intervals to complete each task. I am stumped on how to show this information for all the records I will have.
Thanks in advance for any feedback.
record task1 task2 task3 task4 task5 task6 task7
1 10:00:00 10:08:00 10:10:00 10:10:45 10:11:00 10:12:22 10:20:16
2 11:05:14 11:15:04 11:17:45 11:18:35 11:18:55 11:20:00 11:28:36
3
4
5
So I have the time it takes to complete each task by subtracting the the start time of the next task from the previous one (task2-task1 = time it takes to complete task 1; task3-task2 = time it takes to complete task2...so on), with the exception of the last task with is the total time to complete the job (task7-task1 = total time to complete job).
When it's all said and done, I will have over 100 records and want to show a breakdown of how long it takes to complete its job based on the time intervals to complete each task. I am stumped on how to show this information for all the records I will have.
Thanks in advance for any feedback.