yellowcabguy
Active Member
- Joined
- Dec 28, 2005
- Messages
- 440
I am calculating the length of time a dog is at a shelter. The date the dog arrives is compared to the current date; that number is divided by 365 and I get things like 1.3 years or 1.5 years,etc.
However I want to show that number as years and months. So 1.5 years would actually be 1 years 6 months.
Is there a way to do that??
However I want to show that number as years and months. So 1.5 years would actually be 1 years 6 months.
Is there a way to do that??