Hi all,
I built a chart as showing on the picture... the progress bar is inserted from shapes in excel. I would like to link the following:
column A3 = 85%, and the bar is 85% progress, what I need is when I change the A3 to 90%, I would like to link the progress with the bar, that's way the bar is showing progress (85% to 95%)
and the same for A5, and A7.
also, I need to set up the conditional format in the progress bar as showing in the pic as well.
thoughts?