Loop until command button click or wait until command button click

jey_sea

New Member
Joined
Apr 23, 2010
Messages
21
I'm having trouble with the following code; '

Do Until Application.Workbooks("atk softwarebuttons.xls").Sheets _
("RunData").CommandButtonMessageComplete.Click

Loop


Return (or continue on with more code after the command button click...)

Question: how can I get code to hate for a command button click tbefore continuing with VBA commands?

Note: I know a message box could be used but I do not wish to use the message box with button controls.

is there another approach; ie wait until command button click?
 

Some videos you may like

Excel Facts

Format cells as date
Select range and press Ctrl+Shift+3 to format cells as date. (Shift 3 is the # sign which sort of looks like a small calendar).

Subscribe on YouTube

Watch MrExcel Video

Forum statistics

Threads
1,106,946
Messages
5,514,333
Members
408,997
Latest member
VJarvis

This Week's Hot Topics

  • Sort code advice please
    Hi, I have the code below which im trying to edit but getting a little stuck. This was the original code which worked fine,columns A-F would sort...
  • SUMPRODUCT with nested If statement
    Hi everyone, Hope you're all well. I'm hoping someone will be able to point me in the right direction with a problem I'm having with a SUMPRODUCT...
  • VBA - simple sort is killing me!
    Hello all! This should be so easy, but not for me, apparently! I have a table of data that can be of varying lengths and widths. My current macro...
  • Compare Two Lists
    I have two Lists and I need to be able to Identify differences between them. List 100 comes from a workbook - the other is downloaded form the...
  • Formula that deducts points for each code I input.
    I am trying to create a formula that will have each student in my class start at 100 points and then for each code that I enter (PP for Poor...
  • Conditional formatting formula required for day of week and a value
    Hi, I have a really simple spreadsheet where column A is the date, column B is the activity total shown as a number and column C states the day of...
Top