Brutality
New Member
- Joined
- Feb 5, 2003
- Messages
- 44
Hi there,
I know I can do the following manually using multiple sort fields and drag and drop, but wondered if there was any way to automate the following request:
I have a spreadsheet with thousands of entries for a Car rally, and wish to allot parking IDs using a new incremental column. The new ParkingID criteria is based on the type of rally the entrant is in, and whether or not they are a driver; there is a driver column with all drivers being given a Y (as some entries are navigators) and there are 3 rally types - short, medium, and long. I want to start a new column with the first short rally entrant that is a driver being given the ID 1000, the next short rally entrant driver would then be 1001. The first medium entrant driver ID is 2000, the next medium entrant driver is 2001. The first long entrant driver is 3000 and so on.
As I said initially, I could use 2 or 3 sorts to do this and simply drag using a visual cue but that's too easy - yet I have no clue how to automate this process. Any ideas?
TIA
Mark
I know I can do the following manually using multiple sort fields and drag and drop, but wondered if there was any way to automate the following request:
I have a spreadsheet with thousands of entries for a Car rally, and wish to allot parking IDs using a new incremental column. The new ParkingID criteria is based on the type of rally the entrant is in, and whether or not they are a driver; there is a driver column with all drivers being given a Y (as some entries are navigators) and there are 3 rally types - short, medium, and long. I want to start a new column with the first short rally entrant that is a driver being given the ID 1000, the next short rally entrant driver would then be 1001. The first medium entrant driver ID is 2000, the next medium entrant driver is 2001. The first long entrant driver is 3000 and so on.
As I said initially, I could use 2 or 3 sorts to do this and simply drag using a visual cue but that's too easy - yet I have no clue how to automate this process. Any ideas?
TIA
Mark