I mean pivot table.
The formula is =(Networkdays(scheduleddate,targeteddate)/5)/3. there are a is a list of about 200 scheduled and 200 targeted that it is pulling from all dates are in the correct range, so no start dates are after end dates or end dates before start dates. could it be the number is to big to calculate.