Sharid
Well-known Member
- Joined
- Apr 22, 2007
- Messages
- 1,064
- Office Version
- 2016
- Platform
- Windows
I want to use this progress bar code. Link however I am not 100% sure how to link it back to my macro , so that the progress reflects completion of my macro. The LENGTH of the task will vary depending on what the user has input. I had another progress bar, but that would reach 100% way before the code had complete the task. I can only assume I had not linked it correctly to my code.
Could someone please have a look at the above link and advise WHERE in the code I need it to track the progress of my code that is running. As the LENGTH of the task will vary, I assume somewhere in the taskbar code this option will need to keep changing. I could try to set the code to get that bit of data from a sheet cell reference. If this is the case can someone please advise what part in need to change.
Hope that makes sense.
Could someone please have a look at the above link and advise WHERE in the code I need it to track the progress of my code that is running. As the LENGTH of the task will vary, I assume somewhere in the taskbar code this option will need to keep changing. I could try to set the code to get that bit of data from a sheet cell reference. If this is the case can someone please advise what part in need to change.
Hope that makes sense.