verticals | ||||||||||||
exp heads (EH) | V 01 | V 02 | V 03 | V 04 | V 05 | V 06 | V 07 | V 08 | V 09 | V 10 | V 11 | Total |
01 | 1.2 | 2.3 | 4.0 | 3.6 | 1.1 | 2.5 | 3.4 | 1.9 | 0.4 | 2.1 | 1.3 | 23.80 |
02 | 8.00 | 0.37 | 0.00 | 0.18 | 5.00 | 0.08 | 0.51 | 0.00 | 0.27 | 0.00 | 0.00 | 14.41 |
03 | 0.00 | 0.18 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.18 |
04 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.07 | 1.64 | 0.00 | 0.06 | 0.00 | 0.00 | 1.77 |
Total | 9.20 | 2.85 | 4.00 | 3.78 | 6.10 | 2.65 | 5.55 | 1.90 | 0.73 | 2.10 | 1.30 | 40.16 |
EH 01 | V 04 (Rs.4 cr, 9.96 %), V 03 (Rs.3.6 cr, 8.96 %), V 03 (Rs.3.4 cr, 8.47 %), V 02 (Rs.2.5 cr, 6.23 %), V 02 (Rs.2.3 cr, 5.73 %), V 02 (Rs.2.1 cr, 5.23 %), V 01 (Rs.1.9 cr, 4.73 %), V 01 (Rs.1.3 cr, 3.24 %), V 01 (Rs.1.2 cr, 2.99 %), V 01 (Rs.1.1 cr, 2.74 %), V 01 (Rs.0.4 cr, 1 %), | |||||||||||
The cell in bold is the output required. The given data is a matrix of Expense heads & Verticals. For every Exp. head, Verticals are to be given (along with the index head/code) in a descending magnitude order (along with the amt. & % of grand total). In certain cases, where some verticals may have '0' amt., the verticals listing should stop. | ||||||||||||