dmacmillan
Board Regular
- Joined
- Apr 5, 2004
- Messages
- 123
Hello All,
I am working on an operational forecasting model that is 45.2MB in ".xlbs" format. Development requires coping a calculation block of say 1,000 lines and inserting below the previous module.
The issue, it takes over two minutes to insert just one row on a sheet that has over 18,000 lines.
Have reset UsedRange(s), removed files in XLSTART, removed unnecessary ".xla" files, removed conditional formatting and renamed the file.
A full calculation (not rebuild) takes about 2 seconds (timed using FASTExcel form Charles Williams).
Would curving out calculations from the large worksheets into new worksheets be sensible on the basis that I under stand calculations move left to right, then top to bottom?
This is driving me bonkers.
Would really appreciate your thoughts.
Kind regards,
David
I am working on an operational forecasting model that is 45.2MB in ".xlbs" format. Development requires coping a calculation block of say 1,000 lines and inserting below the previous module.
The issue, it takes over two minutes to insert just one row on a sheet that has over 18,000 lines.
Have reset UsedRange(s), removed files in XLSTART, removed unnecessary ".xla" files, removed conditional formatting and renamed the file.
A full calculation (not rebuild) takes about 2 seconds (timed using FASTExcel form Charles Williams).
Would curving out calculations from the large worksheets into new worksheets be sensible on the basis that I under stand calculations move left to right, then top to bottom?
This is driving me bonkers.
Would really appreciate your thoughts.
Kind regards,
David