Hello!

I have a model of the progression of a work based on different stages, streams, etc which is quite complex.
You input the productivity and it outputs the end date based on that productivity.
Now I want to do the opposite, ie specify the end date and find the minimum productivity that can achieve that.

How can I do that? It's not a single function, but a cascade of functions that distribute the workload in weeks up to the end.

I assume I can write a function that will specify that the specific date, the workload must be the first zero.
But how can I approach this to give me the minimum productivity?

Thanks!
 

Excel Facts

Format cells as currency
Select range and press Ctrl+Shift+4 to format cells as currency. (Shift 4 is the $ sign).

Forum statistics

Threads
1,214,864
Messages
6,121,986
Members
449,058
Latest member
oculus

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top