Hello All,
I have a problem, however when I have tried to get to grips with the PT it seems to get very complex!
I have say a single Project with hours worked on specific days for a particular trade, these hours are split between Normal, Time+Half, Double Time (in seperate columns).
I was hopeful of producing a PT ultimately detailing ..by Trade, Total Normal Hours, Time+Half Hours, Double Time Hours against the Project.
Is this possible and are PTs the best way of going about it or would I be better considering an Array option?
Thanking you in advance.
Sam
This message was edited by Sam40mUK on 2002-03-19 14:32
This message was edited by Sam40mUK on 2002-03-19 15:56
I have a problem, however when I have tried to get to grips with the PT it seems to get very complex!
I have say a single Project with hours worked on specific days for a particular trade, these hours are split between Normal, Time+Half, Double Time (in seperate columns).
I was hopeful of producing a PT ultimately detailing ..by Trade, Total Normal Hours, Time+Half Hours, Double Time Hours against the Project.
Is this possible and are PTs the best way of going about it or would I be better considering an Array option?
Thanking you in advance.
Sam
This message was edited by Sam40mUK on 2002-03-19 14:32
This message was edited by Sam40mUK on 2002-03-19 15:56