    Default Re: Charting construction schedule


  2. #12
    MrExcel MVP tusharm's Avatar
    Join Date
    May 2002
    Posts
    11,007
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    1 Thread(s)

    Default

    I don't know how you are doing the visual effect, but if you are using conditional formatting, just create a condition that reflects an overlap of design and construction and use a color that reflects a combination of red and blue. If you use RGB=255,0,255, the result is pink! {g} Some darker shade of it (plum? purple?) might be more appropriate.

    Quote Originally Posted by Calamity Jane
    I have multiple construction projects and need to plot two sets of start and end dates for each. Project A might have these dates:

    Design Start: March 2001
    Design End: February 2002
    Construction Start: December 2001
    Construction End: June 2003

    The design section would be a blue 'bar' and the construction section would be a red 'bar' for each project. As you can see for Project A, Design does not end before Construction begins. One solution would be to plot this on two rows for each project, but I know the bosses won't like that look, so I'm working on alternatives.

    Don't use too much of your valuable time on this monster. I just thought maybe somebody had encountered this type of monster before.

  3. #13
    New Member
    Join Date
    Mar 2004
    Posts
    5
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)

    Default Re: Charting construction schedule

    Try this:

    http://www.mrexcel.com/tip058.shtml

    If you can't find it through that link, go to the tip of the day and go to the archived files and search for Gantt or conditional formatting.

    Mike

Some videos you may like

User Tag List

Like this thread? Share it with others

Like this thread? Share it with others

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •