Andrew Cantrell
New Member
- Joined
- May 1, 2002
- Messages
- 1
I have a summary spreadsheet with links to underlying spreadsheets.
What is the best way to implement version control so that if any changes occur to the underlying sheets or the summary a new version /revision number is generated and the original (baselined) version is left intact.
Andrew
What is the best way to implement version control so that if any changes occur to the underlying sheets or the summary a new version /revision number is generated and the original (baselined) version is left intact.
Andrew