I have an OLAP tool running wich links to Excel. I have a graph connected to it in Excel. It's a graph that shos profit for all the months. But there is data till May in it, so in May the grap goes to zero. How can I avoide this.
PS : Even in monts with zero is a formula connecting to the OLAP (TM1) tool
PS : Even in monts with zero is a formula connecting to the OLAP (TM1) tool