Hi all,

So, I've two fields with week numbers. One consisting of the week number in which an activity starts (StartWeekNumber) and one with the end week numbers (FinishWeekNumbers). I'm constructing a graph with on the x-axis as a minimum the StartWeekNumber and as a maximum the FinishWeekNumber. How could this be done?