I am having a problem with linking cells.
For example, Sheet1, cell H14 formula is: sum(H12:H13). Sheet2, cell H13 needs to have the data value from Sheet1, cell H14 inserted into it. Sheet2, cell F19 needs to have the data value from Sheet1, F19 added to what is in Sheet2, cell C19.
Is this even possible? If the sheet needs to be emailed to someone, I can do provide it if it makes this any easier.
Thanks in advance for any help.
Donny
For example, Sheet1, cell H14 formula is: sum(H12:H13). Sheet2, cell H13 needs to have the data value from Sheet1, cell H14 inserted into it. Sheet2, cell F19 needs to have the data value from Sheet1, F19 added to what is in Sheet2, cell C19.
Is this even possible? If the sheet needs to be emailed to someone, I can do provide it if it makes this any easier.
Thanks in advance for any help.
Donny