Network problem

Mathieu0648

New Member
Joined
Apr 6, 2015
Messages
1
Hi,
I need help for a network problem,
The problem is a network that have summit and arc.
I need the model to pass metric ton by trucks to the end of the network.
1. I have to add a constraint that if the model use that route, it add 10$ to the total of the model.

2. I have to add a contraint that add 15$ to the total, everytime a truck pass on that route but the maximum weight everytime is 15 metric ton.
(for this one, if I put the fonction IF, it say that my model make a circular reference)

Thank you for your answer :)
 

Excel Facts

How to calculate loan payments in Excel?
Use the PMT function: =PMT(5%/12,60,-25000) is for a $25,000 loan, 5% annual interest, 60 month loan.

Forum statistics

Threads
1,216,091
Messages
6,128,779
Members
449,468
Latest member
AGreen17

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top