XY (Scatter) Chart Question | Key Events for Project 1.1

DrHacker

New Member
Joined
Jun 4, 2018
Messages
33
Hello Mr. Excel Masters!

I create a chart to visualize "Key Events for a Project" based in a XY (Scatter) Chart.

There is a way that Horizontal Axis reflect the dates entered for the chart? I mean, Each milestone date show on the axis instead of a range of time?

Link to Template download:

https://www.linkedin.com/feed/update/urn:li:activity:6403277644422619136

open
 

Excel Facts

Spell Check in Excel
Press F7 to start spell check in Excel. Be careful, by default, Excel does not check Capitalized Werds (whoops)

Forum statistics

Threads
1,216,088
Messages
6,128,744
Members
449,466
Latest member
Peter Juhnke

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top