Hi all,
Hoping someone can help with this.
I have
Job quantity - Cell B5
Material cost - Cell D3
Parts per material quantity - Cell D4
Lets say a sheet of material at £100 can manufacture 10 parts, my job quantity is 1-10. I still want to charge for the full sheet of material even at 1 part. Same if the job quantity is 11-20 i'd still want to charge for 2 sheets of material (£200) and so on.
How can this be achieved?
Hopefully this is a good enough explanation of what i need.
Thanks for any help,
Glen
Hoping someone can help with this.
I have
Job quantity - Cell B5
Material cost - Cell D3
Parts per material quantity - Cell D4
Lets say a sheet of material at £100 can manufacture 10 parts, my job quantity is 1-10. I still want to charge for the full sheet of material even at 1 part. Same if the job quantity is 11-20 i'd still want to charge for 2 sheets of material (£200) and so on.
How can this be achieved?
Hopefully this is a good enough explanation of what i need.
Thanks for any help,
Glen