Help with Date check formula

melheath

New Member
Joined
Aug 11, 2011
Messages
2
Hi

I need some help!! :confused:

I want to write a formula which will check some KPIs for me. For this I need to be able to calculate the number of WORKING days (ignoring weekends) between 2 dates entered into a spreadsheet.

Is this possible!?

Thanks
Mel
 

Excel Facts

How to create a cell-sized chart?
Tiny charts, called Sparklines, were added to Excel 2010. Look for Sparklines on the Insert tab.
Hi

I need some help!! :confused:

I want to write a formula which will check some KPIs for me. For this I need to be able to calculate the number of WORKING days (ignoring weekends) between 2 dates entered into a spreadsheet.

Is this possible!?

Thanks
Mel
Try...

=NETWORKDAYS(A2,B2)

where A2 and B2 houses dates with A2 <= B2.
 
Upvote 0

Forum statistics

Threads
1,224,508
Messages
6,179,188
Members
452,893
Latest member
denay

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top