New worksheet ply

esgca2010

New Member
Joined
Jul 29, 2010
Messages
27
Very basic question. I'm using the Sampling tool in the Data analysis group and would like to know definition of "PLY" in "New Worksheet Ply".

Thank you... Elaine
(y)
 

Some videos you may like

Excel Facts

Create a chart in one keystroke
Select the data and press Alt+F1 to insert a default chart. You can change the default chart to any chart type

venkat1926

Well-known Member
Joined
Aug 21, 2005
Messages
4,824
In the excel data analysis under correlation the following help is available

This will be there in the correlation dialog box.
New Worksheet Ply
Click to insert a new worksheet in the current workbook and paste the results starting at cell A1 of the new worksheet. To name the new worksheet, type a name in the box.
 

Subscribe on YouTube

Watch MrExcel Video

Forum statistics

Threads
1,106,981
Messages
5,514,612
Members
409,008
Latest member
spiner55

This Week's Hot Topics

  • Sort code advice please
    Hi, I have the code below which im trying to edit but getting a little stuck. This was the original code which worked fine,columns A-F would sort...
  • SUMPRODUCT with nested If statement
    Hi everyone, Hope you're all well. I'm hoping someone will be able to point me in the right direction with a problem I'm having with a SUMPRODUCT...
  • VBA - simple sort is killing me!
    Hello all! This should be so easy, but not for me, apparently! I have a table of data that can be of varying lengths and widths. My current macro...
  • Compare Two Lists
    I have two Lists and I need to be able to Identify differences between them. List 100 comes from a workbook - the other is downloaded form the...
  • Formula that deducts points for each code I input.
    I am trying to create a formula that will have each student in my class start at 100 points and then for each code that I enter (PP for Poor...
  • Conditional formatting formula required for day of week and a value
    Hi, I have a really simple spreadsheet where column A is the date, column B is the activity total shown as a number and column C states the day of...
Top