I have this table with this information. Each operator works one of the following six-hour shifts: midnight-6 A.M., 6 A.M.-noon, noon-6 P.M, and 6 P.M.-midnight.
The question I need to answer which I think I can answer using Solver is: What is the minimum number of operators needed?