Dear Experts,
The metal would be considered the estimate calculation is 2.000+0.200*4920+500 = 11324
The another wastage would be considered the estimate calculation is 2.200*10%*4920+500 = 11324
The ACPL product would be considered the estimate calculation is 10.000*250+500 = 3000
The Silver product would be considered the estimate calculation is 10.000*10%*70+500 = 1270
I want suitable formula in J11, so multi calculation result in one cell. Please refer and help.
Thanks,
The metal would be considered the estimate calculation is 2.000+0.200*4920+500 = 11324
The another wastage would be considered the estimate calculation is 2.200*10%*4920+500 = 11324
The ACPL product would be considered the estimate calculation is 10.000*250+500 = 3000
The Silver product would be considered the estimate calculation is 10.000*10%*70+500 = 1270
I want suitable formula in J11, so multi calculation result in one cell. Please refer and help.
Thanks,