I need to produce a schedule chart for construction projects. The X axis would be a timeline. I want 2 'floating' bars for each project. There would be a design bar (starts at design start date and ends at design end date) as well as a construction bar (const. start date to end date). Y axis is Projects.
My data is arranged in 5 columns: Project Name, Design Start Date, Design End Date, Construction Start Date, Construction End Date.
Any ideas?