I have a spreadsheet in Column P i have a drop down of 11 different findings. In Column M i have a calculated time based on 2 other fields for when a truck
started to be loaded and when the truck was finished being loaded.
I am trying to calculate the average time it took to load a truck where based on the Column M values when Column P is not blank
attached is an image of the formula i am trying to use and the errors i get.
I want the entire column M and P to be part of the formula. Because some days we have 10 shipments other days there could be 150
Thanks for your assistance
started to be loaded and when the truck was finished being loaded.
I am trying to calculate the average time it took to load a truck where based on the Column M values when Column P is not blank
attached is an image of the formula i am trying to use and the errors i get.
I want the entire column M and P to be part of the formula. Because some days we have 10 shipments other days there could be 150
Thanks for your assistance