I have been working on this for a few days, tried different formulas, but can't seem to figure it out.
I plan loading times and # of trucks @ warehouses. In my planning i come up with how many trucks will be loaded at once at each warehouse which i call loading config ( example : 2+2+2 )
Each truck takes 2 hours to load.
So for example, i could have a total of 6 trucks at a warehouse but if my loading config is 2+2+2 that will only use up 3 time slots.
I am most likely not very clear, but maybe he image below will clarify.
Essentially i am wanting to have the number of trucks entered automatically bases on the loading config.
I plan loading times and # of trucks @ warehouses. In my planning i come up with how many trucks will be loaded at once at each warehouse which i call loading config ( example : 2+2+2 )
Each truck takes 2 hours to load.
So for example, i could have a total of 6 trucks at a warehouse but if my loading config is 2+2+2 that will only use up 3 time slots.
I am most likely not very clear, but maybe he image below will clarify.
Essentially i am wanting to have the number of trucks entered automatically bases on the loading config.