Hi
I have recently working on a couple of weekly planners over 3 to 4 months and I have had the change the month and the day manually. I was wondering if there is an easier way to do this. The planner goes from monday to friday with saturday and sunday in the same column and the month and date are above the days of the week
Any help would be great
Thanks
Brian
I have recently working on a couple of weekly planners over 3 to 4 months and I have had the change the month and the day manually. I was wondering if there is an easier way to do this. The planner goes from monday to friday with saturday and sunday in the same column and the month and date are above the days of the week
Any help would be great
Thanks
Brian