Hello. I'm looking for a formula to help with product build rollout. I have a table showing different waves, start dates, wave duration, and product count. I want the daily build table to populate accordingly based on the inputs at the top. The below is a general example. If I change any of the fields above, I'd like the table to update. All days assume an equal build count. The non build days should just show zero. Sorry if I'm not explaining it coherently. ("Wave#" = A1)