m17347047711116
New Member
- Joined
- Aug 28, 2002
- Messages
- 7
I have a bar graph that i have made with 2 sets of series one represents staff required every 15 minutes and the other series represents number of staff scheduled every 15 minutes.
Problem looks great when i go in and change the series range each week as the start time of the shift is always changing,
is there a way that if the staff required = 0 and the staff scheduled = 0, that the graph will not show the empty time slots, it takes up alot of room and confuses everyone. I only want the graph to start where there is someone required or there is someone scheduled
Problem looks great when i go in and change the series range each week as the start time of the shift is always changing,
is there a way that if the staff required = 0 and the staff scheduled = 0, that the graph will not show the empty time slots, it takes up alot of room and confuses everyone. I only want the graph to start where there is someone required or there is someone scheduled