Sorry if this is a stupid question, but I've never used excel to graph before and googling wasn't very helpful on setting this up.
I have a formula that I want graphed as a curved line... =(LN(B5)-LN(0.1))/J8.
I want the left plot (y axis) to scale from B5 down to a value of 0.1
I want the x axis to scale appropriately in hours to accomidate the y axis scale.
How do I do this?
I have a formula that I want graphed as a curved line... =(LN(B5)-LN(0.1))/J8.
I want the left plot (y axis) to scale from B5 down to a value of 0.1
I want the x axis to scale appropriately in hours to accomidate the y axis scale.
How do I do this?