Bayesatthemoon
New Member
- Joined
- Oct 21, 2015
- Messages
- 7
Hi everyone, hope you're all well and healthy.
I want to show the change in the cost of building my V2.2 product relative to my V2 product. The change is due to some parts being scrapped, some parts no longer being used and new parts being added.
A plain waterfall would be easy. It would show cost of V2 as a value, then reduction due parts scrapped as a down bar, another down bar from parts no longer used, an up bar from parts being added and finishing up with the cost of my V2.2
But my product is made of many different types of components: metal, plastic, pcb, motor etc. So I would like to have each bar stacked according to the different components. Can you please help me do that?
I want to show the change in the cost of building my V2.2 product relative to my V2 product. The change is due to some parts being scrapped, some parts no longer being used and new parts being added.
A plain waterfall would be easy. It would show cost of V2 as a value, then reduction due parts scrapped as a down bar, another down bar from parts no longer used, an up bar from parts being added and finishing up with the cost of my V2.2
But my product is made of many different types of components: metal, plastic, pcb, motor etc. So I would like to have each bar stacked according to the different components. Can you please help me do that?