I need to create a test plan tracking tool that will keep a running date stamp history. I enter Pass/FAil when running the test, then stamp a cell with Now() to indicate when the test was run.
I need to be able to 1) keep a history of each time a test is run (w/o using the change history function of Excel - it's not a shared spreadsheet) by either copying the current cell value to another cell or keeping the current value of the cell if it hasn't changed.
Does any of this make any sense, and does anyone have a slick way to do it?
I need to be able to 1) keep a history of each time a test is run (w/o using the change history function of Excel - it's not a shared spreadsheet) by either copying the current cell value to another cell or keeping the current value of the cell if it hasn't changed.
Does any of this make any sense, and does anyone have a slick way to do it?