Thanks, I ended up using Jonno1's method. I can follow the binary code in it. So Tuesday is 1011111 and Wednesday is 1101111 etc. And the week is easily changed by changing -1,1 to -1,2. And I put a lot of thought into how to handle the 8th because that is part of the next week by using
=IF(WORKDAY.INTL(($A$1&1)-1,1,"1110111")>WORKDAY.INTL(($A$1&1)-1,1,"0111111"),WORKDAY.INTL(($A$1&1)-1,1,"1110111"),WORKDAY.INTL(($A$1&1)-1,2,"1110111")).
After a few hours of copy and paste and changing 1's and 0's, I figured out that in C1 I could put =B1+1 and in D1 I have = B1+2 and so on. I have a tendency to over think things.