How to Calulate Lead Time based on work days

alavenderlily

New Member
Joined
Feb 26, 2006
Messages
34
I'm trying to determine how to calculate lead time based on work days.

Initial Date: 6/1/09 (Cell B66)
Lead Time: 72 business days (Cell C68)
X: This is what I'm trying to solve for, which would be 72 business days from B66 (Cell D68).

Desired output is date format of B66+C68 with only business days


Note: I am using add-in Analysis Tool Pack

Thanks!
 

Excel Facts

Can you AutoAverage in Excel?
There is a drop-down next to the AutoSum symbol. Open the drop-down to choose AVERAGE, COUNT, MAX, or MIN

Forum statistics

Threads
1,215,515
Messages
6,125,279
Members
449,220
Latest member
Excel Master

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top