Is there a way in Excel to do the same kind of Time Demand Chart as the one in the link below?
http://home.cogeco.ca/~krugan
I can't find a way on the 'x' axis to show the width in seconds for the flow rate and the amount of time in total during the cycle.
http://home.cogeco.ca/~krugan
I can't find a way on the 'x' axis to show the width in seconds for the flow rate and the amount of time in total during the cycle.