Open New Work Sheet for projects on Main sheet and when new projects are added

Luke4

New Member
Joined
Aug 24, 2022
Messages
8
Office Version
  1. 365
Platform
  1. Windows
Hi,

I have an excel document with a list of projects and need to do notes for each project.
I want to open a worksheet for each project and for the new added projects with a VBA code.
The new worksheet needs be be labeled with the name of the project/s
There also need to be a lay-out on these newly added worksheets
refer to example below.
I have placed the information in the same location as per my original sheet
 

Attachments

  • Screenshot 2022-10-07 070049.png
    Screenshot 2022-10-07 070049.png
    101.5 KB · Views: 7
  • Screenshot 2022-10-07 070136.png
    Screenshot 2022-10-07 070136.png
    105.7 KB · Views: 7

Excel Facts

Show numbers in thousands?
Use a custom number format of #,##0,K. Each comma after the final 0 will divide the displayed number by another thousand
I also want the projects to be hyper link to its relevant worksheet.
So if I click on the name in the main sheet it must take me to the sheet for the relevant project as I have 90+ projects at any given time.
 
Upvote 0
On sheet named: "Progress"
You have sheet names starting in Range("F8")
And you want to create new sheets with these names.
Not sure what you want to do with QN Number

I see it at the top of sheet but do not know where on top of sheet

You said:
I want to open a worksheet for each project
Do you mean create a new sheet or activate a sheet already made?
 
Upvote 0
On sheet named: "Progress"
You have sheet names starting in Range("F8")
And you want to create new sheets with these names.
Not sure what you want to do with QN Number

I see it at the top of sheet but do not know where on top of sheet

You said:
I want to open a worksheet for each project
Do you mean create a new sheet or activate a sheet already made?
Yes create a new sheet for each project and when adding new projects to the main sheet ("Progress" Sheet)
The QN number must be in the newly created sheet for relevant project as per the 2nd picture.
I want the lay-out of the new sheets to be as per the 2nd picture
The sheet names must only be the name of the project.
 
Upvote 0
The second image shows the project name and the QN number on the top of the sheet above Row 1

There is no place above Row 1 to enter data
 
Upvote 0
The 2nd image is the lay-out I want to be automatically included on the new created sheets for the projects.
No data required above the Name and QN number.
 
Upvote 0
The 2nd image is the lay-out I want to be automatically included on the new created sheets for the projects.
No data required above the Name and QN number.
I asked where on the sheet is the Name and QN number to be entered.
Tell me something like Range ("G1")
You said look at image 2. I cannot tell from looking at image where to enter Name and QN
 
Upvote 0
The 2nd image is the lay-out I want to be automatically included on the new created sheets for the projects.
No data required above the Name and QN number.
The 2nd image is the lay-out I want to be automatically included on the new created sheets for the projects.
No data required above the Name and QN number.

To make it simple,
1st Requirement:
I have a list of projects in the main (Active) sheet, that I need to make daily notes for.
I want to create sheets for the existing project separately in the same work book and when a new project is added.
I want this to be automated
The label of the new created sheets must be the name of the project

2nd Requirement:
The newly created sheets must include the lay-out and formatting of the 2nd picture attached to original post

3rd Requirement:
I want the projects listed in the main (Active) sheet to be hyper linked to its relevant sheet created as I have 90+ projects
 
Upvote 0
I asked where on the sheet is the Name and QN number to be entered.
Tell me something like Range ("G1")
You said look at image 2. I cannot tell from looking at image where to enter Name and QN
Sorry my Bad,
If possible I want it to be as per the heading in sheet 1, combined.
If not possible the the heading can be removed and the Name of the project in A1 and the QN in B1
 
Upvote 0
I suggest you create a new sheet and name it "Master"

Now every time you double click on the cell value in the Range "E8" Of your sheet named Progress and below a new sheet will be created just like the sheet named "Master"
The name of the sheet will be the value in range "F8" in this example on sheet "Progress"
And the header for that sheet will have the proper values.

Why you decided to start on E8 is a mystery but that is OK

Will this work?
And a Hyperlink can be added so in you click on E8 you will be taken to the proper sheet name
 
Upvote 0

Forum statistics

Threads
1,215,059
Messages
6,122,916
Members
449,093
Latest member
dbomb1414

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top