Reinforcement Schedule in a building

deependra

New Member
Joined
Nov 7, 2010
Messages
3
Hiii dear readers,


I am trying to prepare a bar bending schedule which basically calculates length weights of various shapes of bent reinforced bars .


2s679tz.jpg





I will input dia of bar, no of elements , bars and cutting length which I will calculate from the drawing.

Now the slightly tricky part..


Now when I enter the code I should be able to automatically get the shape of corresponding code and entering A,B,C as 100,500 , 100 etc. should help me to write the same in the placeholders adjacent to the shape as shown.

I will then calculate the total length based on the entries made.


Now I move to other row and similiarly second shape, second length and so on and so fourth.


Any ideas please??



Regards,

DV
 

Excel Facts

Wildcard in VLOOKUP
Use =VLOOKUP("Apple*" to find apple, Apple, or applesauce

Forum statistics

Threads
1,215,054
Messages
6,122,901
Members
449,097
Latest member
dbomb1414

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top