marshy3300
Board Regular
- Joined
- Aug 17, 2014
- Messages
- 59
Hi - I have a report that spits out false info. Due date (F) populates 2 dates. In this case there are 4 x 27/06/19 that shouldn't exist. This in turn means the WIP Qty is 4 numbers short (I).
How can I push (I) down everytime it finds the wrong date? That would also depend on Job # (C) being the same.
As an FYI, the first line for each Job# will always be correct, its only the "required to make product xx" which stuffs up the report.
<colgroup><col><col><col><col><col></colgroup><tbody>
</tbody>
Not even sure its possible!
Thanks in advance
How can I push (I) down everytime it finds the wrong date? That would also depend on Job # (C) being the same.
As an FYI, the first line for each Job# will always be correct, its only the "required to make product xx" which stuffs up the report.
<colgroup><col><col><col><col><col><col><col><col></colgroup><tbody> </tbody> |
<colgroup><col><col><col><col><col></colgroup><tbody>
</tbody>
Not even sure its possible!
Thanks in advance