Can you generate a progress circle using dates instead of values?

JessWhyCuh

New Member
Joined
Jul 10, 2018
Messages
15
So, I know how to generate a progress chart with the doughnut pie charts but those are based on values like 0-100%, for example.

My question is: Is there a way to generate a progress (pie) chart based on dates? Like, you're tracking a project from it's start date to end date?

Also, to create a pie chart you need values? You can't base the chart on if the cells are populated with data?

Hope I'm being clear... Thanks!
 

Excel Facts

Easy bullets in Excel
If you have a numeric keypad, press Alt+7 on numeric keypad to type a bullet in Excel.

Forum statistics

Threads
1,215,028
Messages
6,122,753
Members
449,094
Latest member
dsharae57

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top