Scheduled vs Actual Date

horizonflame

Board Regular
Joined
Sep 27, 2018
Messages
184
Office Version
  1. 2013
Hello,

In column A I have the scheduled date for a task to be done. In column B I input the real date of task when it is done. In Column C I want to reference the real date if entered, or if real date is blank reference the scheduled date.

Can someone suggest a formula please?

Thank you!
 

Excel Facts

Ambidextrous Undo
Undo last command with Ctrl+Z or Alt+Backspace. If you use the Undo icon in the QAT, open the drop-down arrow to undo up to 100 steps.
I think this should work

=IF(B1="",A1,B1)
 
Upvote 0

Forum statistics

Threads
1,216,146
Messages
6,129,142
Members
449,488
Latest member
qh017

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top